Capacity: announced, energized and billable
A campus's announced MW, energized MW and customer-delivered, billable MW describe different stages. Confirm whether a figure is planned, interconnected, commissioned or leased before comparing projects.
REFERENCE GUIDE · DATA CENTER TERMS
IDC Atlas tracks projects, campuses, power, cooling and compute hardware through public sources. These terms separate project marketing, engineering progress and deliverable capacity; they do not replace the primary disclosure attached to each item.
Open the project and company pulseA campus's announced MW, energized MW and customer-delivered, billable MW describe different stages. Confirm whether a figure is planned, interconnected, commissioned or leased before comparing projects.
Capital expenditure may cover land, halls, servers, networking, power and cooling. It measures build intensity, but does not by itself prove demand, activation speed or future free-cash-flow conversion.
High-density campuses need usable power, transmission and distribution work, and the relevant interconnection and permitting path. Announced scale becomes more credible as that path becomes specific.
Liquid cooling addresses heat at higher rack densities. Read disclosures for the cooling architecture, deployment scope, rack density and delivery status rather than treating the label as a capacity claim.
GPU count is only one part of a cluster. Networking, storage, power, cooling, the software stack and operations determine whether a system can sustain training or inference workloads.
These definitions are a reading framework, not conclusions about any individual project. Use the original source and specific date attached to each item for capacity, delivery, product and financial claims.