IDC ATLASINTELLIGENCE CONSOLE
SyncingIndustry map
Fact change
Research published
Brief edition
System scan
Verification
0 · 0 sources
中文
INFRASTRUCTURE CENTER

From silicon to grid,
AI turns physical.

Compute, networking, power, cooling and campus capacity — with selective China coverage where it affects global competition.

6supply-chain nodes0campus updates
01 · SUPPLY CHAIN

Six infrastructure nodes

The latest source-linked signal at each point in the AI infrastructure stack.

02 · COMPUTE

NVIDIA product radar

Current product form factors and infrastructure read-throughs.

03 · SELECTIVE COVERAGE

China watch

Only developments with a material global supply-chain or competitive read-through.

04 · MODEL DEMAND

Usage and capability signals

GLOBAL AI DIFFUSION%

Generative-AI adoption

Quarterly public adoption indicator.

Source ↗
OPENROUTER · WEEKLY USAGE

Loading

ARENA · CODE / WEBDEV

Public evaluation

05 · CAMPUS & COOLING

Physical deployment