IDC ATLASINTELLIGENCE CONSOLE
SyncingGlobal Intelligence
Industry news
—
Research published
—
Daily selection
—
Data retrieved
—
Included records
0 · 1 sources
中文
Latest by section

Dates refer to the original report, not the collection time. No new content does not confirm that all sources were checked.

Section information is temporarily unavailable.

← Back to Global Intelligence
REPORTED DEVELOPMENT

Oklo files an emergency FERC complaint after PJM removes a 750MW hybrid project from study

Utility Dive reports that Oklo asked FERC to restore a 750MW hybrid project to its original PJM study position. The proposal combines 150MW of advanced nuclear, 300MW of fuel cells and 300MW of gas generation. PJM reportedly removed it over application issues including low-voltage ride-through information. The complaint does not publicly identify the project or confirm its relationship to a Meta-backed campus.

ORIGINAL SOURCEUtility Dive
PUBLIC RESPONSE

The current state is media reporting; later primary material will upgrade the status without determining visibility.

ENTITIES
OkloPJMFERCMeta
REPORTING STATUS
Media · single source