IDC ATLASINTELLIGENCE CONSOLE
SyncingGlobal Intelligence
Industry news
—
Research published
—
Daily selection
—
Data retrieved
—
Included records
0 · 1 sources
中文
Latest by section

Dates refer to the original report, not the collection time. No new content does not confirm that all sources were checked.

Section information is temporarily unavailable.

← Back to Global Intelligence
REPORTED DEVELOPMENT

POWER Magazine: ONE Nuclear signs an LOI for a gas plant and large BESS in Louisiana

POWER Magazine reports that ONE Nuclear signed a binding letter of intent for site control over Louisiana’s Project Cayman, comprising a 2.88GW gas plant and a 700MW/2.88GWh battery system intended to sit alongside a data-center complex. The report does not name the data-center customers, and the LOI is not operating or commissioned capacity.

ORIGINAL SOURCEPOWER Magazine
PUBLIC RESPONSE

The current state is media reporting; later primary material will upgrade the status without determining visibility.

ENTITIES
REPORTING STATUS
Media · single source